Marine Test Requirements based on IACS Unified Requirement E10 & IEC60945


General:   The aim is to have an agreed consolidated “worst-case” test schedule, which will meet the current
requirements of all the major Classification Societies.  The schedule will fully cover the IACS
Unified Requirement E10 and, in addition, the relevant sections of IEC60945 (latest valid revision
applies, at present this is IEC60945:2002) for ECDIS, which relate specifically to marine personal
computer products, when used within a protected environment. The schedule will not cover the
ECDIS requirements for Visual Display Units, at the present time.

TEST     E10      IEC60945 (Revision 4)

1)   Dry Heat   IEC60068-2-2     IEC60945 Section 8.2.2.2

Test requirement:  The equipment shall be operational and subjected to a temperature of +70°C +/- 2°C for
16 hours.

Required standard:    No degradation of the equipment performance.

2)  Low Temperature  IEC60068-2-1     IEC60945 Section 8.4.2.3

Test requirement:   The equipment shall be operational and subjected to the following cold temperature test:
-25°C +/- 2°C for a period not less than 16 hours.

Required standard:    No degradation of the equipment performance.

3)  Damp Heat   IEC60068-2-30     IEC60945 Section 8.3

Test requirement:    The equipment shall be operational and subjected to the following humidity test:
+55°C +/- 2°C @ 95% +/- 5% Humidity for 12 hours, followed by +20°C +/- 5°C for 6
hours. This complete cycle is to be repeated with the equipment non-operational.

Required standard:    No degradation of the equipment performance.

4)  High Voltage

Test requirement:    1500V 50Hz between Live/Neutral & Earth for 1 minute.

Required standard:  No insulation breakdown during test and no degradation of the equipment performance
after completion of the test.

5)  Vibration   IEC60068-2-6     IEC60945 Section 8.7.2

Test requirement:   The equipment shall be operational and tested in three mutually perpendicular axes as
follows:  for each axis the sweep shall be carried out from 2-13.2Hz at +/-1mm and from
13.2-100Hz at +/-0.7g.
The unit is to be vibrated for a period of 2 hours at each resonant frequency with an
amplification factor of 2 or above, or at 30Hz if no resonance is found.

Required standard:  No degradation of the equipment performance.

6)  Power Supply Variation  IEC60092-504     IEC60945 Sections 7.1 & 7.2

Test requirement:   The equipment shall be operational and tested for both 230V & 110V
Deviation: +/-10% (voltage) with +/-5% (frequency)
Transient test (2 seconds): +/-20% (voltage) with +/-10% (frequency)
Tests to be performed before, during and after dry heat and low temperature tests.

Required standard:    No degradation of the equipment performance.

Test Requirements (Issue 6)   21/03/06   Page 1 of 4 MARINER SYSTEMS (UK) Ltd
Marine Test Requirements based on IACS Unified Requirement E10 & IEC60945


7)  Power Supply Failure  IEC60092-504     IEC60945 Section 10.8.2

Test requirement:   Unit swiched on and checked to be operational. Power turned off for 60 seconds.  System
powered up and retested for 90 seconds to ensure that it is fully operational – this test to
be repeated two more times with no failures detected.

Required standard:    No degradation of the equipment performance.

8)  Conducted LF   IEC60533     IEC60945 Section 10.2.2 (Rev 3)

Test requirement:   The equipment shall be operational. A signal generator shall be connected, using an
isolation transformer (as detailed in Figure  5 of IEC60945), to the mains input of the
equipment. The output voltage of the signal generator shall be set initially to 10% of the
power supply voltage and the frequency swept from 50Hz to 900Hz. The signal generator
output voltage shall be reduced to 1% at 6kHz and then held at that level until 10kHz.

Note:     This test was deleted by IEC60945 Revision 4.

Required standard:   No degradation of the equipment performance.

9)  Conducted RF   IEC61000-4-6     IEC60945 Section 10.3.2

Test requirement:  The equipment shall be operational and the test applied to both power and signal lines.
The frequency shall be swept from 10kHz to 80MHz amplitude modulated at 1kHz +/-
10% and 400Hz +/-10% to a modulated depth of 30% and 80%, amplitude maintained at
3V rms.
The equipment shall also be subjected to the same series of tests at the following spot
frequencies: 2, 3, 4, 6.2, 8.2, 12.6, 16.5, 18.8, 22 and 25MHz at 10V rms with 80% +/-
10% modulation at 400Hz +/-10%.

Note:   Measurement between 10kHz – 150kHz was deleted by IEC60945 Revision 4.

Required standard:   No degradation of the equipment performance.

10)  Electromagnetic Field  IEC61000-4-3     IEC60945 Section 10.4.2

Test requirement:   The equipment shall be operational. The equipment shall be exposed to an electric field
of 10V/m swept from 30kHz-2GHz amplitude modulated at 1kHz +/-10% and 400Hz +/-
10% to a modulation depth of 30% and 80% +/-10%.

Required standard:    No degradation of the equipment performance.

11)  Radiated Emissions  IEC60533     IEC60945 Section 9.3.2
CISPR 16-1 & 16-2

Test requirement:    The equipment shall not radiate RF signals greater than:

Frequency  Limits (dBµV/m)  Notes
10kHz - 300kHz  80 – 50  1
300kHz - 30MHz  50 – 34  1
30MHz - 156MHz  54  
156MHz - 165MHz  24  2
165MHz - 2GHz  54  

Notes:     1. No longer required by IEC60945 Revision 4
2. Alternative methods described by IEC60945 Revision 4

Required standard:    Radiated levels must be below stipulated limits.

Test Requirements (Issue 6)   21/03/06   Page 2 of 4 MARINER SYSTEMS (UK) Ltd
Marine Test Requirements based on IACS Unified Requirement E10 & IEC60945


12)  Conducted Emissions  IEC60533     IEC60945 Section 9.2.2

Test requirement:     The equipment shall not emit conducted levels greater than:

Frequency  Limits (dBµV/m)
10kHz - 150kHz  96 – 50
150kHz - 350kHz  60 – 50
350kHz - 30MHz  50

Required standard:    Radiated levels must be below stipulated limits.


13)  Electrostatic Discharge  IEC61000-4-2     IEC60945 Section 10.9.2

Test requirement:  a) Air discharge: The equipment shall be subjected to an electrostatic discharge of 8kV
applied to any exposed metal part of the system. This will be repeated 10 times, in a
number of different places, for both positive and negative polarity.
b) Contact discharge: The above process will be repeated for contact discharge at a level
of 6kV, for both positive and negative polarity.

Required standard:    No degradation of the equipment performance.

14)  Insulation Resistance  IEC60092-504     IEC60945 Sections 8.3 & 8.4

Test requirement:  The equipment shall be tested initially, before and after the humidity and low temperature
tests and after the final test. The insulation between live & neutral to earth shall be tested
for both polarities and shall not be less than 10Mohms.

Required standard:   No degradation of the equipment performance.

15)  Bursts/Fast Transients  IEC61000-4-4     IEC60945 Section 10.5.2

Test requirement:   With the equipment operational a fast transient pulse will be applied for a period of 10
minutes, as follows:
Power supply line:  2kV differential at 2.5kHz
Signal and control lines: 1kV common mode at 5kHz
Pulse rise time: 5nS (10% and 90%)
Pulse width: 50nS (50% value)
Application: 15mS burst every 300mS

Required standard:   No degradation of the equipment performance.

16)  Surge Immunity   IEC61000-4-5     IEC60945 Section 10.6.2

Test requirement:   With the equipment operational a 2kV common mode pulse shall be applied to line/earth
for a minimum of 10 minutes at a rate of one pulse/minute. With the equipment
operational a 1kV differential pulse shall be  applied to line/line for a minimum of 10
minutes at a rate of one pulse/minute. These tests shall be repeated for both polarities.

Required standard:    No degradation of the equipment performance.

17)  Static Inclination   IEC60092-504

Test requirement:  With the equipment operational it shall be inclined to a minimum angle of 22.5° either
side of horizontal at two mutually perpendicular axes for a period of at least 15 minutes.

Required standard:   No degradation of the equipment performance.

Test Requirements (Issue 6)   21/03/06   Page 3 of 4 MARINER SYSTEMS (UK) Ltd
Marine Test Requirements based on IACS Unified Requirement E10 & IEC60945


18)  Dynamic Inclination  IEC60092-504

Test requirement:  With the equipment operational it shall be rolled to a minimum angle of 45° either side of
horizontal at two mutually perpendicular axes for a period of at least 15 minutes.

Required standard:   No degradation of the equipment performance.


19)  Acoustic Noise:        IEC60945 Section 11.1.2

Test requirement:   With the equipment operational the level of acoustic noise emanating from the equipment
shall be recorded.

Note:     New definition within IEC60945 Revision 4, as follows:

Required standard:  The detected noise pressure level shall not exceed 60 dB(A) at a distance of 1m from any
part of the EUT.

20)  Compass Safe Distance:       IEC60945 Section 11.2.2

Test requirement:   The equipment shall be tested to determine the Compass Safe Distance. This test will be
repeated with the equipment operational and non-operational.

21)  Access to dangerous voltages:      IEC60945 Section 12.1

Test requirement:   All Mariner Systems (UK) Ltd. products carry the manufacturers European CE Mark
which is the manufacturer’s declaration that the product is safe for use. Part of this safety
requirement is that the “standard finger” safety test be carried out.

Required standard:  No degradation of the equipment performance

22)  Shock Test

Test requirement:   The equipment is to be mounted on a vibration table and tested in three mutually
perpendicular axes with a shock test of 15g 11mS ½ sine applied for 20 pulses.

Required standard:  No degradation of the equipment performance.

Test Requirements (Issue 6)   21/03/06   Page 4 of 46489
国家标准下载

下载说明:
1.请先分享,再下载
2.直接单击下载地址,不要使用“目标另存为”
3.压缩文件请先解压
4.PDF文件,请用PDF专用软件打开查看
5.如果资料不能下载,请联系本站
最新评论
发表评论
大名:
联络: QQ 或者 邮箱
内容:不能超过250字,需审核,请自觉遵守互联网相关政策法规。

验证码: 2226